Top Page > Products > LCD Inspection and Repair System‚“ / PV Cell Measurement System‚“ > Mask related > A Pellicle Inspection and Pellicle Mounting System for LI712 71PA/71PP
PRODUCTS
LCD Inspection and Repair System‚“ / PV Cell Measurement System‚“

Mask related

A Pellicle Inspection and Pellicle Mounting System for LI712

71PA/71PP
Automatic processing from particle inspection to mounting of pellicle by in-line connection of 71PA/71PP and LI712 A Pellicle Inspection and Pellicle Mounting System for LI712 71PA/71PP
Catalog
Mail

Applications

  • Automatic transportation and mounting of pellicle in the manufacturing process of large size photomasks.
  • Inspection of particles on pellicle by reflective scattering light (Quality confirmation inspection of pellicle)

Features

  • This one system implements the whole process from inspection, tentative mounting through final mounting of a pellicle.
  • In-line connection with LI712 drastically reduces particle contamination of both masks and pellicles.
  • Installation of ionizers keeps clean environment by guarding against particle sticking and avoids productivity deterioration caused by re-mounting of pellicles.
  • Jigs for clamping a pellicle are stocked in arrangement by their sizes in a stocker and this system is compatible with pellicles of various sizes, accordingly.
  • Exfoliate paper can be peeled off automatically without giving excess stress by detecting tensile stress at a clamp when a pellicle is taken out of a carrying case of masks by a clamp.
  • In the pellicle mounting process, alignment procedure is available based on the measurement of distance between the mask edge and the pellicle edge by CCD cameras set at 4 places.
  • Automatic inspection of particles on pellicle, a review function, a particle-elimination function by air blow and a front-side / back-side inverting function implement high operability.
  • Because detected defects can be observed either in bright field or in dark field, and image data of particles can be stored, this tool is effective not only for good/no good verification but also for quality control and defect analysis.
  • After tentatively mounting pellicle on a mask, the mask is transferred to the final mounting tool. The final mounting tool is equipped with adsorption pads that work by air pressure bonding and are placed at a regular interval, and accordingly, the final pellicle mounting is performed with uniformity due to application of constant pressure and time for pressure bonding.

Specifications

Pellicle sizeFull size for G10
Inspection speed≒40 mm/sec
Inspection width=60 mm
Scattering light detectorOptical fiber coupling PMT*
* Optical fiber coupling photo multiplier tube
Detectable particle size≒5 μm
Inspection areaPellicle inner surface beyond 5 mm inside the pellicle frame
Outer dimensions (mm)5800(W)×3900(D)×3800(H) 
Dimension may differ depending on specification
Weight (kg)About 2500

Configuration

Main body, Control rack, PC desk

Catalog
mail
PAGE TOP